Creating Linked Reservations
|
Top Previous Next |
| 1. | Select the dates desired for RV 1 (and 2 and 3)
|
| 2. | Add RV 1
|
| 3. | Add RV 2 (note that "Synchronize with:" is already checked)
|
| 4. | Add RV 3
|
| 5. | Uncheck "Synchronize with" (prepare to add non-synchronized reservations, linked to RV 1, which is still selected)
|
| 6. | Change the dates if needed for RV 4 (note that you must uncheck "Synchronize with" before changing dates, or else it would affect the RV 1/2/3 sites)
|
| 7. | Add RV 4 (note that RV 4 will now be selected in the Site(s) Added list)
|
| 8. | Uncheck "Synchronize with" again (it's automatically checked each time you add a site, so subsequent synchronized sites can be added easily -- but we don't' want that)
|
| 9. | Add RV 5 (RV 5 will now be selected in the list) Also note that it added RV 5 as a non-synchronized site with RV 1 as the owner, even though RV 4 was selected. Since there's no reason to have multiple levels of non-synchronized sites, it simplifies the structure automatically. The same would be true of Synchronized sites added to each other.
|
| 10. | Select RV 2 in the Site(s) Added list
|
| 11. | Check "Sub-member of" (prepare to add the Stall 1 to RV 2)
|
| 12. | Change the dates if needed
|
| 13. | Add Stall 1
|
| 14. | Select RV 4 in the Site(s) Added list
|
| 15. | Check "Sub-member of" (prepare to add the boat slip and kayak to RV 4)
|
| 16. | Change dates if necessary
|
| 17. | Add Boat slip 1
|
| 18. | Select RV 4 in the Site(s) Added list again
|
| 19. | Check "Sub-member of" again
|
| 20. | Change dates if necessary
|